Anticorrosive polypropylene fiber tap is a new kind of pollution-free and nondestructive product . representing the top level of cold-wrapping tape both at home and abroad and called and c ”anticorrosion champion ”it can be widely used in such anticorrosive constructions as water supply ,steel pipelines for conveying oil ,natural gas and coal gas or underground tank outer anticorrosion or rehabilitation work in oil ,natural gas ,chemical engineering and municipal constructions it is the appointed product replacing asphalt glass cloth and epoxy coal tar by the National Construction Department and Environmental Protection General Bureau .The product is characterized by its easy construction ,shock resistance, aging resistance elongation resistance ,ultra-violet light resistance and high bond strength .
thods of application
Steel pipe surface treatment :rust removal removal , removing welding slag ,burr ,oil and keeping dry and clean ,manual rust removal should reach St3 ,mechanical St2 ,meeting the request of SYH4007-86.
Primer coating: adopting customized mating priming paint .keep away from fire .Spreading equably no matter brushing ,rolling or spraying .priming paint dosage for manual work 12/L ,mechanical construction 20/L.
2.Main technical specification
Item Unit Ordinary Strengthened Specially
Serial Number ------- LX-T760 LX--T770 LX--T780
color -------- Black ,gray ,green or others
Specification mm 50,75,100,150,250,300,500
Rubber
Thickness Basement membrane thickness mm 0.30 0.30 0.60 0.60
Bond line thickness mm 0.85 0.90 1.10 0.95 1.00 1.05
Aggregate thickness mm 1.15 1.20 1.40 1.50 1.60 1.65
Tensile strength Mpa ≥60
Peel
Strength To priming painted steel N/cm ≥45
To priming painted steel N/cm ≥25
Dielectric strength Kv/mm. ≥30
Volume resistivity .m >1×10
Water vapor permeability (24th ) Mg/㎝ <0.45
Thermal antioxidation test 2400h % <25
Antiultraviolet light % ≥80
Water absorption % <0.35
When surface dry (in 5-10minutes ),wrapping can be done .
After the quality inspection is done .the pipes can be put put back into the ditch and be buried .